Construction, Completion and Maintenance of Warehouse Building Works for GWC Logistic Hub at Bu Sulba

Gallery:

Project Info:

The project is located at Bu Sulba, Al Wukair, State of Qatar. It contains 7 warehouses (3 buildings in B7, 1 building in B7A, 1 building in B7C and 2 buildings in B9). Scope of works consists of construction includes supply, installation, testing & commissioning of Electrical, Plumbing & Drainage, Fire Fighting, Fire Alarm, HVAC and Telephone/Data works. The project was successfully completed that complied and satisfied all contract and specified requirements.

Project Details:

Client: Gulf Warehousing Company

Consultant: Qatar Design Consortium

Main Contractor: Al Bader Construction & Steel Works WLL

Project Duration: 13 Months

Status: Completed